5
years max
Get the installation inspected and tested
Have the fixed electrical installation inspected and tested by a qualified, competent person at least every five years, or sooner if the last report says so.
Regulation 3(1)(b)
A landlord EICR checks the fixed wiring in your rental and gives you the report the law asks for. We arrange a qualified electrician, send you the paperwork, and help you keep track of the dates: the five-year renewal, the 28-day copy to tenants, and the 28-day deadline for any repairs.
Maximum gap between inspections
To give tenants a copy, or to fix C1, C2 & FI items
Maximum penalty a council can impose per breach
Copy to tenant ✓within 28 days done 14/3!
The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 apply to most private tenancies in England. Every duty below comes from those regulations, written in plain English.
Have the fixed electrical installation inspected and tested by a qualified, competent person at least every five years, or sooner if the last report says so.
Each existing tenant must receive a copy of the report within 28 days of the inspection. Email is fine if the tenant agrees to receive documents that way.
A new tenant must have a copy of the most recent report before they occupy the property. Add it to your move-in pack next to the gas certificate and EPC.
If the report needs remedial work or further investigation, it must be completed within 28 days, or sooner if the report gives a shorter deadline.
Once remedial work is done, get written confirmation from the electrician and send it, with the report, to the tenant and the local council within 28 days.
The local housing authority can ask to see the report, and you have 7 days to provide it. Keep a copy to give the inspector who does the next one.
Councils can impose a financial penalty of up to £30,000 per breach and can arrange remedial work themselves, then recover the cost from you. Breaches can also affect HMO and selective licensing applications. The cheapest way to stay compliant is to keep the dates on file.
Most private tenancies in England are covered, but some arrangements are excluded. Answer five questions for a quick indication. It isn’t legal advice, but it tells you where you stand.
This looks like a tenancy covered by the 2020 regulations. Book an inspection if you don’t have a current report, and give each tenant a copy within 28 days.
Wales and Scotland also require EICRs every five years, under their own laws. See the summary further down this page.
Holiday lets aren’t tenancies, so the 2020 regulations don’t apply. Insurers, platforms and fire risk assessments usually still expect an EICR.
If you or your family live there and share facilities with your lodger, the regulations don’t apply. An EICR is still the simplest way to show the home is safe.
Tenancies granting a right of occupation for seven years or more fall outside the 2020 regulations.
The rules apply where a tenant occupies the property as their only or main home and pays rent. Talk to us and we’ll help you work it out.
Other exclusions include social housing (now covered by separate rules), student halls, hostels and refuges, care homes, hospitals and hospices. If in doubt, check GOV.UK guidance or ask us.
Enter the date of your last inspection to see where you are in the cycle, when to book, and the deadlines to note. You can also save the reminders straight to your calendar.
Nothing you enter here leaves your browser.
8 weeks’ notice gives time for access and repairs
28 days after the inspection date
Only applies if the report is unsatisfactory
C1, C2 and FI items must be resolved by this date
Downloads an .ics file for Google, Outlook or Apple Calendar.
An EICR covers the fixed installation: wiring, sockets, switches, light fittings, the consumer unit and permanently connected equipment. Tap a marker to see what happens in each part of the home.
The fuse board is where most testing starts. The electrician checks its condition, how it’s mounted and whether it’s suitable, then confirms every circuit has the right protection.
The kitchen draws the most current, so the cooker circuit, sockets near water and any hard-wired appliances get close attention.
Water and electricity call for tighter rules. Fittings must be suitable for their zone, and circuits must have 30mA RCD protection.
A sample of accessories is opened to check connections, and every circuit is tested for continuity, insulation resistance and polarity.
Where it’s safe and accessible, the electrician looks at cables in the loft for damage, poor joints, rodent damage, and cables buried under insulation that could overheat.
The electrician checks where the supply comes in, the earthing arrangement, main bonding to gas and water, and any outdoor sockets, lights or outbuildings.
Each observation on the report gets a code. Any C1, C2 or FI makes the overall result unsatisfactory, and the 28-day repair clock starts from the inspection date.
A real risk of injury right now, such as exposed live parts. The electrician should make it safe before leaving, often by isolating the circuit.
Not dangerous yet, but it could become so, for example missing earthing or no RCD where one is needed. Urgent remedial work is required.
Something couldn’t be fully assessed during the visit and could hide a fault. It has to be investigated before the report can be signed off.
Not up to the latest standard but not unsafe, such as an older consumer unit. On its own, a C3 doesn’t fail the report.
Got an unsatisfactory report? You don’t have to use the same electrician for the repairs, but you do need written confirmation that the work is complete. Ask for a Minor Works or Electrical Installation Certificate for each fix, and send copies to your tenant and the council within 28 days.
An EICR is priced on the number of circuits, which follows the size of the property. These are our typical fixed prices. We confirm yours in writing before booking, with no surprises on the day.
Larger installations, extra distribution boards, outbuildings, poor access, or very old wiring that takes longer to test. If something comes up, we tell you before any extra work, and repairs are always quoted separately. Prices shown are a guide and depend on location and availability.
We handle the coordination, so you aren’t stuck passing messages between the electrician and your tenant.
Address, bedrooms, whether it’s an HMO, and who’s handling access.
We confirm the price and offer slots that work for you and your tenant.
Tenant notice, key collection or agent handover, all agreed in advance.
Power is off for short periods. The electrician tests every accessible circuit.
Your EICR is emailed as a PDF, ready to forward to tenants, with any repairs quoted.
Tenants usually expect at least 24 hours’ written notice before a visit. Fill in the details, copy the letter, and send it by email or text. The more notice they get, the more likely the visit goes ahead first time.
Dear {tenant},
Re: Electrical safety inspection at {address}
As your landlord, I am required by the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 to have the electrical installation in your home inspected and tested by a qualified electrician.
The inspection is booked for {weekday} {date}, with the electrician arriving between {time}. It usually takes between two and five hours.
During the visit, the power will be switched off for short periods. Please:
• make sure the electrician can reach the fuse board, sockets and the loft if there is one
• back up anything important on computers and switch them off safely
• keep fridge and freezer doors closed while the power is off
You will receive a copy of the report within 28 days of the inspection.
If this time doesn’t suit you, please let me know as soon as possible so we can arrange another date.
Thank you for your help.
Kind regards,
{sender}
The legal duty is the same. What changes is how many properties there are, who coordinates access, and how the paperwork is filed.
One property, one report, and reminders before each renewal so it doesn’t slip.
Individual rooms, communal areas and landlord supplies covered, with paperwork ready for licensing.
One booking list for many addresses, with a separate report and renewal date for each.
We liaise with tenants directly and send reports in a consistent format for your records.
Renting out a former home? We’ll explain what applies and what doesn’t, step by step.
Find any repairs before a buyer’s survey or before the first tenant moves in.
The regulations say the inspector must be “qualified and competent”. This is what that means in practice, and what’s different outside England.
2020 regulations: EICR at least every 5 years, copies to tenants within 28 days, repairs within 28 days.
Under the Renting Homes (Wales) Act, landlords need an EICR at least every 5 years for occupation contracts.
Private landlords need an EICR every 5 years, plus PAT testing of any appliances they provide.
Private tenancies require periodic electrical safety checks. Check current NI Direct guidance for your tenancy.
Can’t see your question? Call us on 020 3386 1854.
For most private tenancies in England, yes. The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require landlords to have the fixed electrical installation inspected and tested at least every five years and to give copies of the report to tenants.
Up to five years, but the inspector can recommend a shorter interval if the installation’s condition calls for it. Always use the “next inspection” date on the report, not the five-year maximum.
No. A valid report covers the property, not the tenancy. Give each new tenant a copy of the current report before they move in. You only need a new inspection when the existing one expires, or sooner if the report says so.
Any C1, C2 or FI observation must be put right, or investigated, within 28 days, or sooner if the report says so. Once it’s done, get written confirmation from the electrician and send it, with the original report, to your tenant and the local council within 28 days of completion.
An EICR covers the fixed installation, including permanently connected equipment such as an electric shower, extractor fan or hard-wired cooker circuit. Plug-in appliances you supply are covered by PAT testing, which isn’t required by the English regulations but is good practice and required in Scotland.
Most flats and houses take 2–5 hours. Power is switched off for short periods while each circuit is tested, so let tenants know in advance to save work and avoid alarms or freezers being affected.
Keep a written record of every reasonable attempt to arrange access, including dated notices and messages. The regulations recognise that a landlord isn’t in breach if they can show they took all reasonable steps. Our tenant notice template above is a good place to start.
Short-term holiday lets aren’t covered by the 2020 private rented sector regulations because guests don’t have a tenancy. Most insurers, booking platforms and fire risk assessments still expect electrical safety to be shown, and an EICR is the standard way to do that.
Only if it’s still within its stated validity and was carried out to the standard the regulations require, by a qualified and competent person. Many homebuyer reports are older or partial, so if in doubt, book a fresh inspection before letting.
Tell us about the property and we’ll come back with a written fixed price and available dates. There’s no obligation and no hard sell.